Probleme bei der Bemessung – Bewährungsgrad > 8 % und Überschreitung der Schubspannung (Teddy)
|
|
1
|
35
|
October 20, 2025
|
Analyzing of a basic reinforced concrete beam with Teddy
|
|
1
|
51
|
October 16, 2025
|
How to define a moving spring (mobile load) in +PROG SOFIMSHC?
|
|
1
|
18
|
October 15, 2025
|
Simple slab model ELLA error no. 908
|
|
2
|
19
|
October 14, 2025
|
Unterschiedliche Hauptquerkraft und Bemessungsquerkraft bei QUAD
|
|
2
|
23
|
October 14, 2025
|
Bedding results vs node support force results
|
|
0
|
18
|
October 14, 2025
|
Organizing Teddy code extracted from SOFIPLUS
|
|
1
|
45
|
October 14, 2025
|
Node deletion
|
|
1
|
42
|
October 9, 2025
|
Parametrization of materials
|
|
5
|
58
|
October 9, 2025
|
Benutzer Text innerhalb eines Moduls
|
|
1
|
22
|
October 9, 2025
|
Using MAXIMA combinations for Design of area elements
|
|
7
|
74
|
October 7, 2025
|
Probleme mit Öffnungen und Flächenelementen in Sofimsha (Teddy) / Issues with Openings and Surface Elements in Sofimsha (Teddy)
|
|
1
|
25
|
October 4, 2025
|
Creating a list/array with all elements belonging to a given group in sofimshC
|
|
7
|
131
|
October 2, 2025
|
Fehlermeldung in CSM bei start der Berechnung der CS
|
|
1
|
25
|
October 1, 2025
|
Plate with random field bedding stiffness
|
|
1
|
36
|
October 1, 2025
|
Materialnummer über TVAR und GAXV variabel definieren
|
|
3
|
78
|
September 30, 2025
|
Schnittgrößen aus Volumenelementen erzeugen
|
|
3
|
53
|
September 22, 2025
|
Load-Application via LZUG
|
|
1
|
46
|
September 22, 2025
|
Meshing with sofimshC and sofimshA
|
|
2
|
1024
|
September 18, 2025
|
Question on Initial Deformation in Dynamic Analysis (Moving Load with ASE)
|
|
0
|
35
|
September 15, 2025
|
Bridge column design
|
|
1
|
86
|
September 13, 2025
|
Cable optimazation prestress calculation
|
|
0
|
53
|
September 11, 2025
|
Berechnung mehrere nichtlineare Lastfälle
|
|
1
|
62
|
September 11, 2025
|
Quad steel/conc stresses NONL analysis
|
|
1
|
46
|
September 9, 2025
|
PT design - check depth of neutral axis
|
|
0
|
32
|
September 8, 2025
|
Tendon grouting stage impact
|
|
0
|
22
|
September 8, 2025
|
Beul- /Traglastfaktorenberechnung unter Berücksichtigung von nicht-linearem Materialverhalten und Vorspannung
|
|
0
|
35
|
September 3, 2025
|
Capacity check for existing beam elements
|
|
1
|
77
|
September 1, 2025
|
Applying a Hydrostatic Load on a 2D Fixed-End Wall
|
|
3
|
61
|
August 31, 2025
|
Asymmetrisches Anspannen der tendons bei Vorspannung / asymmetrical prestressing of tendons
|
|
2
|
57
|
August 26, 2025
|