a bridge is constructed via incremental launching
the sofistik model uses group activation for modelling of different construction stages
beam loads can be applied for the whole bridge. they will be activated according to the beam activation via group control correctly, i.e. only for the part of the bridge that is launched yet
nodal loads can not be applied in a similar straight forward manner. An error occurs for those loads, that are referring to nodes which are not connected to the model (as the respective beams are not activated yet).
Is there a simple way to use nodal force (similar to beam loads) without the neccesity to create different load case for different construction stages?