Hello everyone,
I am working on a project that involves detailing reinforcement for a structure with complex geometry using SOFiCAD & i have facing a few challenges.The structure I am dealing with has several irregularly shaped beams and columns; with varying cross sections that change along their length.
It is challenging for me to precisely position the reinforcement inside these components. The automatic placement tools do not seem to fully accommodate the variations in cross section, leading to overlaps & clashes in some cases; Is there a way to fine tune the reinforcement placement for such elements manually, or perhaps a method to better optimize the automatic placement?
Also i have read this resorse/artical; https://forum.sofistik.de/t/hinge-in-structural-line-compone-gh-work-law-sofistikmule-dev but have not found any solution still need your advice. if you have any advice please share with me
Does anyone have tips on how to effectively manage and organize these schedules within SOFiCAD??
Thanks in advance for your help!!!