Hello SOFiSTiK Team,
As part of my thesis, I am currently modeling an existing bridge in SOFiSTiK. The structural system consists of several individual beams that are connected to each other through connection elements. In addition, each beam includes a prestressing system with 7 tendons.
While setting up the model, I have some questions regarding the construction stages and prestressing:
-
Construction stages and prestressing
When I create the construction stages, I continuously receive warning messages and errors related to prestressing. The software seems to require a separate construction stage assignment for each prestressing tendon, which becomes quite difficult to manage.
Could you please advise how this should be handled correctly in SOFiSTiK? Is there a recommended workflow for assigning prestressing tendons in such a case? -
Existing bridge – need for construction stages
Since the bridge already exists and I am not modeling a new construction process, I would like to ask whether it is necessary to define detailed construction stages at all.
Or would it be sufficient to model the bridge directly in its final structural state, including the existing prestressing?
I would appreciate your guidance on the recommended approach for this type of bridge model.
Thank you very much for your support.
Best regards,
Amir